Renovation of LSA Anzio Camp , Basra International Airpot,Basra,Iraq

Design and Construction of new camp and the work including grading, sub-grading, technical inspection of eighty (80) dry trailers and sixteen (16) we ablution trailers, provide and install HVAC unit, provide and install 3.0 MW electrical power with all concrete pads and sunshade, provide and install electrical power cables and connect all the trailers with power generation plant with all electrical power and control panels.